The reinforcing steel and electric and plumbing pipes are prepared,
view is the study room and balcony
Yesterday was again a milestone in the project. The second floor was completed.

Part 1 was completed on 8/1/2011, part 2 two weeks later on 22/1/2011 and again two weeks later on 5/2/2011 part three was completed.

For part 1 we used 137 bags cement, and 11 extra workers 33 total
For part 2 we used 110 bags cement, and 3 extra worker 25 total
For part 3 we used 104 bags cement, only 22 workers



As the walls for part 1 and 2 are finished already, I expect we can complete all 2nd floor walls in one week from now.

At the end of the day we had a party again after the salaries were payed and I announced that as of next week 5 workers will be released.

Below again a brief picture show of this memorable day.




View to the back side study room, bed room and bath room

Overview of the part 3 floors that will be concreted
The line with workers is in place to bring the concrete upstairs


The first concrete is poured ...

... in the far end corner




The line starts at the cement mixer down stairs

At 3.00 pm the whole floor is done




The party starts ...

... we have coke, emperador (rhum), red horse (beer), lots of ice cubes
and snacks and BBQ sticks (chicken feed, blood, and intestines)

They have fun and like this kind of parties

The boss likes emperador

When the salary is paid, they can pay the women
who sell daily snacks and drinks (merienda)